Site-mix your own concrete. Enter cubic yards: get cement bags, sand, aggregate and water for a 1:2:4 mix.
Estimates only. Bag yields per manufacturer specs (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³). Ready-mix trucks carry 8 to 10 yd³. Always round up and confirm with your supplier.
A 1:2:4 site mix (one part cement, two sand, four aggregate) is a traditional general-purpose mix for non-structural work such as shed bases, paths and fence posts. For driveways, slabs that carry vehicles and structural work, use ready-mix to specification. Enter your cubic yards below and the free mix ratio calculator lists cement bags, sand and aggregate volumes, plus approximate water.
How to use the concrete mix ratio calculator
- Enter the finished concrete volume in cubic yards.
- Read the cement bag count (94 lb bags).
- Read the sand and aggregate volumes in cubic yards.
- Use the water guide as a starting point and adjust for workability.
Formula
Dry volume ≈ wet volume × 1.54. Split 1:2:4 by volume: cement 1/7, sand 2/7, aggregate 4/7.
Practical tips
- One cubic yard of 1:2:4 needs about 6 bags of cement, 0.44 yd³ sand and 0.88 yd³ aggregate.
- Add water slowly: a soupy mix is weak when it cures.
- Mix at least 3 minutes after the last water goes in.
- Use clean water and aggregate: soil and clay ruin strength.
Frequently asked questions
What is a 1:2:4 concrete mix?
A traditional general-purpose mix for non-structural work. Use ready-mix to specification for structural work.
How much cement per cubic yard of 1:2:4?
About 6 bags of 94 lb cement per cubic yard of finished concrete.
Is site mix as strong as ready-mix?
Not reliably. Site-mixed concrete varies with measuring and mixing, while ready-mix is tested and consistent, so use ready-mix for structural work.
Need volumes first? Try the slab calculator or browse the hub.
Site mixing is the only calculator on this site where the answer is a recipe, not a volume. A 1:2:4 mix is one part cement, two parts sand and four parts aggregate by volume, and the trap is that dry ingredients take up more space than the finished concrete: the dry volume is about 1.54 times the wet volume, because the sand and aggregate pack down and the cement paste fills the gaps. The calculator applies that 1.54 factor first, then splits the dry volume into its seven parts.
Worked example
Take 2 cubic yards of finished 1:2:4 concrete. Dry volume is 2 x 1.54 = 3.08 cubic yards. Cement is one seventh: 3.08 / 7 = 0.44 cubic yards, which is 11.88 cubic feet. A 94 lb bag of cement is about 1 cubic foot, so that is 12 bags, matching the rule of about 6 bags per cubic yard of finished concrete. Sand is two sevenths: 3.08 x 2 / 7 = 0.88 cubic yards. Aggregate is four sevenths: 3.08 x 4 / 7 = 1.76 cubic yards. Add water slowly and mix at least 3 minutes after the last water goes in.
Common mistake
The usual error is skipping the 1.54 dry volume factor and measuring out 2 cubic yards of dry ingredients for 2 cubic yards of concrete, which leaves you short by more than a third. The second error is adding water until the mix looks easy to pour: a soupy mix is weak when it cures, so add water a little at a time, and use clean water and aggregate, because soil and clay ruin strength.
Frequently asked questions
What is a 1:2:4 concrete mix?
A traditional general-purpose mix for non-structural work such as shed bases, paths and fence posts. Use ready mix to specification for driveways, slabs that carry vehicles and structural work.
How much cement per cubic yard of 1:2:4?
About 6 bags of 94 lb cement per cubic yard of finished concrete.
Is site mix as strong as ready mix?
Not reliably. Site mixed concrete varies with measuring and mixing, while ready mix is tested and consistent, so use ready mix for structural work.

Written by Kaleemullah, who runs Concrete Quantity and writes the guides and builds the calculators. Every figure on this page comes from the formula shown on the page and the sources listed below, so you can check the working yourself. Where a figure is an estimate, the page says so.
Sources: Mix formulas stated on this page, dry volume at 1.54 times wet volume, split 1 part cement, 2 parts sand and 4 parts aggregate by volume.
Last checked: 19 November 2026.