Epoxy Floor Coating Calculator


Epoxy kits and gallons for a concrete floor. Enter the floor size and coats, pick your product, and get a kit count with waste included.



Materials planning only. New concrete must cure at least 28 days before coating, and the coverage here is for smooth concrete, so rough or porous floors need more.



Epoxy floor coating calculator

A 20 ft by 20 ft garage with 2 coats needs 4 one car EpoxyShield kits with 10 percent waste. The calculator above works out the same count for any floor: area times coats, divided by the coverage per kit or per gallon, with waste added.

How to use

  1. Enter the floor length and width in feet or metres.
  2. Enter the number of coats, usually 2.
  3. Pick your product: a 1 car kit, a 2.5 car kit, or 100 percent solids epoxy by the gallon.
  4. Read the kit or gallon count and the litres of mixed epoxy.

Formula

Paint area = floor area x coats; kits = paint area with waste / coverage per kit. One Rust-Oleum EpoxyShield 1 car kit covers about 250 sq ft per coat, and the 2.5 car kit covers about 500 sq ft per coat. A gallon of 100 percent solids epoxy covers about 160 sq ft at 10 mils dry film, from the coating identity: 1 gallon covers 1,604 sq ft at 1 mil.

Practical tips

  • Wait 28 days on new concrete. Fresh concrete must cure at least 28 days before coating, or trapped moisture will lift the epoxy off the floor.
  • Rough concrete eats coverage. A kit covers about 250 sq ft on smooth concrete but only 125 to 200 sq ft on rough or porous concrete, so add waste and buy a spare kit.
  • Two thin coats beat one thick coat. A thick coat traps solvent and peels, while two coats at 3 to 3.5 mils each bond properly and last years longer.
  • Etch and clean first. Oil, dust and curing compounds stop the bond. Degrease, etch and let the floor dry fully before the first coat goes on.

Frequently asked questions

How many coats of epoxy does a garage floor need?

Two coats for a normal garage, plus a clear topcoat if you want extra wear resistance. One coat is too thin to last under hot tyres.

How long before I can drive on a coated floor?

Light foot traffic in 24 hours, but wait at least 72 hours before parking a car on it, and a full 7 days for a heavy vehicle, or the tyres will mark the coating.

What is the difference between a kit and a gallon of epoxy?

A kit is a pre-measured pack with base, activator and chips, sized for one coat of a set area. A gallon of 100 percent solids epoxy is bought by volume and covers about 160 sq ft at 10 mils per coat.

Can I coat over old paint?

Only if the old paint is sound, clean and well stuck. Loose or flaking paint must come off first, and a glossy surface needs sanding so the epoxy can grip.

More in the concrete calculator hub, including sealer, slab and driveway.