Concrete for curbs, kerbs and edging runs. Enter length, width and height: get cubic yards and bags instantly.
Estimates only. Bag yields per manufacturer specs (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³). Ready-mix trucks carry 8 to 10 yd³. Always round up and confirm with your supplier.
Long runs of curb add up fast: 100 ft of 6 by 6 in curb needs 1.02 cubic yards. The free curb concrete calculator below totals any length so your edging, kerb or landscape border order is exact.
How to use the curb concrete calculator
- Measure the total curb length in feet.
- Enter the curb width in inches.
- Enter the curb height in inches.
- Add 10 percent waste: long forms always leak a little.
Formula
Volume = Length × (Width ÷ 12) × (Height ÷ 12) ÷ 27, giving cubic yards.
Practical tips
- 100 ft of 6 in wide by 6 in high curb needs 1.02 cubic yards (46 bags of 80 lb).
- Stake forms every 3 to 4 ft to hold a straight line on long runs.
- Expansion joints every 10 ft stop random cracking.
- A slightly rounded top edge chips less than a sharp one.
Frequently asked questions
How much concrete for 100 ft of curb?
At 6 by 6 inches, 100 ft needs 1.02 cubic yards, or 46 bags of 80 lb mix.
How wide should a concrete curb be?
Six inches wide and 6 inches high suits landscape edging. Road kerbs run bigger.
Bags or ready-mix for curbing?
Over about 2 cubic yards (roughly 200 ft of 6×6 curb), ready-mix is cheaper and far faster.
More in the concrete calculator hub, including stairs and walls.
A curb is a long, thin beam of concrete, and its maths is the simplest on the site: length times cross-section. The only thing that changes against a slab is that both small dimensions are in inches, so the conversion matters twice, and long runs add up fast: a hundred feet of modest 6 by 6 in curb already passes one cubic yard. Because curbs are poured in long forms, the waste allowance matters more than on a small slab, so the calculator defaults to 10 percent.
Worked example
Take 60 ft of curb, 8 in wide and 6 in high. Volume is 60 x (8 / 12) x (6 / 12) = 60 x 0.667 x 0.5 = 20 cubic feet. Divide by 27: 20 / 27 = 0.74 cubic yards. Bags of 80 lb mix: 20 / 0.60 = 33.3, so 34 bags. With 10 percent waste: 0.74 x 1.10 = 0.81 cubic yards, or 37 bags.
Common mistake
The usual error is measuring the curb in inches and forgetting to divide by 12 twice, which inflates the volume by 144 times, or pouring a long run with no expansion joints. Put an expansion joint every 10 ft so the curb cracks where you choose, not at random. Stake the forms every 3 to 4 ft to hold a straight line, and round the top edge slightly, because a sharp edge chips.
Frequently asked questions
How much concrete for 100 ft of curb?
At 6 by 6 in, 100 ft needs 1.02 cubic yards, or 46 bags of 80 lb mix.
How wide should a concrete curb be?
Six inches wide and 6 in high suits landscape edging. Road kerbs run bigger.
Bags or ready mix for curbing?
Over about 2 cubic yards, roughly 200 ft of 6 by 6 curb, ready mix is cheaper and far faster.

Written by Kaleemullah, who runs Concrete Quantity and writes the guides and builds the calculators. Every figure on this page comes from the formula shown on the page and the sources listed below, so you can check the working yourself. Where a figure is an estimate, the page says so.
Sources: Curb volume formula stated on this page, length times width times height divided by 27, with 100 ft of 6 by 6 in curb equal to 1.02 cu yd.
Last checked: 19 November 2026.