Surface evaporation from fresh concrete, using the ACI 305 method. Enter air and concrete temperature, humidity and wind: get the rate and the plastic shrinkage risk band.
Estimates only, using the Menzel equation as published in ACI 305R. The risk bands are a guide for planning precautions; conditions on the day, and how fast you can place, finish and cure, decide the real risk.
Concrete evaporation rate calculator
With air and concrete both at 30 deg C, humidity at 50% and wind at 15 km/h, the evaporation rate is 0.76 kg/m2/h (0.16 lb/ft2/h), which is in the caution band: plastic shrinkage precautions are worth taking. The calculator above works out the same figure for your conditions: enter the air temperature, concrete temperature, relative humidity and wind speed, in metric or imperial, and it returns the rate in both unit systems with its risk band.
How to use
- Enter the air temperature and the concrete temperature (the mix temperature on delivery, not the forecast high).
- Enter the relative humidity as a percentage. Low humidity is the single biggest driver of evaporation.
- Enter the wind speed across the slab surface.
- Read the band: below 0.5 kg/m2/h is low risk, 0.5 to 1.0 is caution, and above 1.0 is high risk of plastic shrinkage cracking.
- If the band is caution or high, plan precautions before the truck arrives, not after the surface starts to tear.
Formula
E = 5 x [ (Tc + 18)^2.5 – r x (Ta + 18)^2.5 ] x (V + 4) x 10^-6 kg/m2/h, the Menzel equation used by ACI 305R, Guide to Hot Weather Concreting. Tc is the concrete temperature and Ta the air temperature in deg C, r is the relative humidity as a decimal, and V is the wind speed in km/h.
When humid air and cool concrete make the raw result negative, the rate is shown as zero with a condensation note, because moisture is arriving at the surface rather than leaving it. Pair this check with our guide to curing concrete for the steps that follow the pour.
Practical tips
- Pour early or late. Moving the pour to the cool, still part of the day can drop the rate by half without any other change.
- Break the wind. Windbreaks, shade and fog spraying all attack the terms of the formula directly: less wind and higher humidity near the surface mean a lower rate.
- Start curing immediately. Apply curing compound or cover the slab as soon as finishing allows. Plastic shrinkage cracks form in the first few hours, while the concrete is still plastic.
- Cool the mix. Shaded aggregates, chilled mix water or ice, and night deliveries keep the concrete temperature term down on hot days.
- Add crew, not water. A high rate shortens your working window. Extra finishers and evaporation retarder keep the surface workable; extra water just weakens it.
Frequently asked questions
What evaporation rate causes plastic shrinkage cracking?
ACI 305R advises precautions as the rate approaches 1.0 kg/m2/h (0.2 lb/ft2/h). This calculator treats 0.5 to 1.0 as a caution band and above 1.0 as high risk, the bands commonly quoted with the ACI 305 nomograph.
How bad is a hot, dry, windy day?
Concrete at 35 deg C, air at 32 deg C, humidity 30% and wind 25 km/h gives 2.20 kg/m2/h, deep in the high risk band. On those numbers, postpone the pour or stack every precaution: windbreaks, fog spray, evaporation retarder and immediate curing.
Which has more effect, wind or humidity?
Both matter. At 20 deg C with humidity at 80% and a light 5 km/h wind, the rate is only 0.08 kg/m2/h. Dropping the humidity or raising the wind pushes it up steeply, because the formula multiplies the humidity term and the wind term together.
Can the evaporation rate be negative?
The raw formula can go negative when warm, saturated air sits over cooler concrete. In practice that means condensation, not evaporation, so the calculator shows zero and flags it.
Does the mix itself change the risk?
Yes. Low bleed mixes (high cement content, silica fume, low water) crack more easily at the same evaporation rate, because less bleed water reaches the surface to replace what evaporates. The rate is the weather side of the risk; your mix sets the other side.
More in the concrete calculator hub, including water cement ratio, sealer and weight.