Patio Concrete Calculator

Concrete for patios in rectangles, circles and L shapes. Enter the size and thickness: get cubic yards, bags, control joint layout and drainage fall.



Estimates only. Patio thickness is typically 4 in. Cut control joints at least one quarter of the slab thickness deep. Confirm the final order with your supplier.




Patio concrete calculator

A 16 by 12 ft patio poured 4 inches thick needs 2.37 cubic yards of concrete (2.61 cubic yards with the standard 10% waste allowance), which is 118 bags of 80 lb concrete mix. The calculator above works out the same figures for any patio: enter the shape, size and thickness, and it returns the volume in cubic yards, cubic metres and bags, a control joint layout, and the drainage fall the slab needs.

How to use

  1. Choose the patio shape: rectangle, circle, or L shape (measured as two rectangles).
  2. Enter the size and the thickness. Patios are typically poured 4 inches thick (minimum 3 to 3.5 in), using a 3,000 to 4,000 PSI mix.
  3. Set the drainage slope: 1/4 in per ft is the recommended maximum, 1/8 in per ft is the minimum, always sloping away from the house.
  4. Leave the waste margin at 10% to cover subgrade dips and spillage.
  5. Optionally add a price per cubic yard to get an estimated material cost.

Formula

Volume = Patio area x Thickness, then divide by 27 for cubic yards.

Area depends on the shape: rectangle = length x width, circle = pi x radius squared, L shape = the sum of the two rectangles. Control joints follow the published rule that spacing in feet should be 2 to 3 times the slab thickness in inches, so a 4 in patio gets joints 8 to 12 ft apart.

Practical tips

  • Space joints 2 to 3 times the thickness. For a 4 in patio, cut or tool joints 8 to 12 ft apart, at least 1 in deep (one quarter of the thickness).
  • Keep panels square. No panel side should be more than 1.5 times the other side; long skinny panels crack across the short dimension.
  • Slope away from the house. A 16 ft patio at 1/4 in per ft drops 4 in from house to edge. Never slope back toward the foundation.
  • Order 10% extra. Patios are rarely perfect rectangles in real backyards, and the subgrade is never perfectly flat; 10% covers both.
  • Compact the subgrade. Soft spots telegraph through a 4 in slab within a season. Compact the base and keep it damp (not muddy) before the pour.

Frequently asked questions

How thick should a concrete patio be?

4 inches is the standard for residential patios (minimum 3 to 3.5 in), poured with a 3,000 to 4,000 PSI mix. Step up to 5 or 6 in where vehicles will drive over it.

How far apart should control joints be on a patio?

Space them 2 to 3 times the slab thickness in inches, measured in feet. A 4 in patio needs joints 8 to 12 ft apart, cut at least 1 in deep, with panels as close to square as possible.

How much slope does a concrete patio need?

Between 1/8 and 1/4 in per foot, sloping away from the house. 1/4 in per ft (about a 2% grade) is the recommended maximum for a comfortable, well draining surface.

How many bags of concrete for a 12 by 12 ft patio?

At 4 in thick, a 12 by 12 ft patio is 48 ft3 (1.78 yd3), which needs 80 bags of 80 lb mix before waste, or 88 bags with 10% extra. Above 2 cubic yards, a ready mix delivery is usually cheaper and far less work.

More in the concrete calculator hub, including sidewalks and slabs.