Concrete Cost Calculator

What will the concrete cost? Enter cubic yards and price: get material cost and coverage area instantly.

Estimates only. Bag yields per manufacturer specs (80 lb ≈ 0.60 ft³, 60 lb ≈ 0.45 ft³, 40 lb ≈ 0.30 ft³). Ready-mix trucks carry 8 to 10 yd³. Always round up and confirm with your supplier.

Five cubic yards at $150 per yard costs $750 in materials and covers 405 square feet at 4 inches thick. Enter your numbers below for an instant concrete cost and coverage estimate.

How to use the concrete cost calculator

  1. Enter the concrete volume in cubic yards.
  2. Enter your price per cubic yard (check local ready-mix quotes).
  3. Optionally enter thickness to see the coverage area.
  4. Read material cost and square footage covered.

Formula

Cost = cubic yards × price per yard. Coverage = yards × 27 ÷ thickness in feet.

Practical tips

  • US ready-mix typically runs $120 to $180 per cubic yard as an example price (check local suppliers for current rates), plus delivery fees. Prices last checked October 2026.
  • Short-load fees apply under 3 cubic yards: ask before ordering.
  • One yard covers 81 sq ft at 4 inches, 54 sq ft at 6 inches.
  • Get 3 quotes: prices vary widely between plants.

Worked examples

Example 1: a 12 by 12 ft patio. At 4 in thick the slab is 48 ft3, or 1.78 cubic yards, so you would order 2 cubic yards. Ready mix: 2 x $150 = $300, plus $150 delivery, plus the $90 short load fee because the load is under 3 cubic yards, gives $540 in total. Bags: 88 bags of 80 lb mix with 10% waste at $6 each comes to $528. The money is about the same at this size, which is why jobs between 1 and 2 cubic yards can go either way: with bags you save nothing once your time and mixing effort count.

Example 2: a 20 by 12 ft driveway. At 4 in thick the slab is 80 ft3, or 2.96 cubic yards, so you would order 3.25 cubic yards with waste. Ready mix: 3.25 x $150 = $487.50, plus $150 delivery, and no short load fee because the load is over 3 cubic yards, gives $637.50 in total. Bags: about 147 bags with waste at $6 each comes to about $882, before you count a full day of mixing. Above 2 cubic yards, ready mix is normally the cheaper and far easier option.

What changes the price

  • Strength of the mix: higher PSI mixes usually cost a little more per cubic yard.
  • Load size: small loads attract the short load fee; one full load is the cheapest way to take delivery.
  • Delivery distance: longer trips from the plant can add fees, and the load must be placed within about 90 minutes of batching.
  • Pumping: if the truck cannot reach the pour, a pump adds a separate hire cost.
  • Timing: weekend and out of hours pours often carry a surcharge.

Frequently asked questions

How much does a yard of concrete cost?

Typically $120 to $180 per cubic yard in the US as an example (October 2026), plus delivery and any short-load fee. Always check local suppliers for current prices.

What is a short load fee?

A $90 surcharge when you order less than 3 cubic yards.

How many square feet does a yard cover?

Eighty-one sq ft at 4 inches thick, 54 sq ft at 6 inches, 36 sq ft at 9 inches.

How much does concrete delivery cost?

In the planning figures used on this site, delivery is $150 per load. Your supplier may charge more for long trips or small loads, and a $90 short load fee applies when the load is under 3 cubic yards.

Is it cheaper to mix my own concrete?

Below about 1 cubic yard (roughly 45 bags of 80 lb mix), bags are usually cheaper because there is no delivery or short load fee. Between 1 and 2 cubic yards it depends on local prices. Above 2 cubic yards, ready mix usually works out cheaper and is far less work.

How much extra concrete should I order?

Order about 10% more than the exact volume. Subgrade dips, spillage and slightly uneven formwork all eat concrete, and running short mid pour costs far more than a little leftover.

Get your volume from the slab calculator or use the full hub.

Related: Ready Mix vs Bags Calculator

Cost is where volume meets the real world, and the two numbers that catch people out are delivery and the short load fee. The material price per cubic yard is only the start: this site’s planning figures add $150 delivery per load and a $90 short load fee on orders under 3 cubic yards, so a small job can cost far more per yard than a big one. The calculator turns volume and price into material cost and coverage area, so you can compare ready mix against bags on the same job.

Worked example

Take 8 cubic yards at $150 per yard. Material cost is 8 x 150 = $1,200. Add $150 delivery, and the total is $1,350. No short load fee applies, because the order is over 3 cubic yards. Coverage at 4 in thick: one cubic yard covers 81 square feet at 4 in, so 8 x 81 = 648 square feet. For comparison, the same 8 cubic yards in bags would be 8 x 45 = 360 bags of 80 lb mix at $6 each, which is $2,160 before a day of mixing, so ready mix is clearly cheaper at this size.

Common mistake

The usual error is budgeting the per-yard price only and forgetting delivery and the short load fee. On a 2 cubic yard order the $150 delivery plus $90 short load fee adds $240, which is 80 percent on top of the $300 material cost. Get three quotes, because prices vary widely between plants, and confirm whether the quoted price includes delivery before you agree it.

Frequently asked questions

How much does a yard of concrete cost?

Typically $120 to $180 per cubic yard in the US as an example, based on prices last checked in October 2026, plus delivery and any short load fee. Always check local suppliers for current prices.

What is a short load fee?

A $90 surcharge when you order less than 3 cubic yards.

How many square feet does a yard cover?

81 square feet at 4 in thick, 54 at 6 in, and 36 at 9 in.

Workers screeding a newly poured concrete slab driveway with timber forms in front of a house
Workers screeding fresh concrete for a driveway.

Written by Kaleemullah, who runs Concrete Quantity and writes the guides and builds the calculators. Every figure on this page comes from the formula shown on the page and the sources listed below, so you can check the working yourself. Where a figure is an estimate, the page says so.

Sources: Planning figures stated on this page, 150 dollars per cu yd, 150 dollars delivery per load, and a 90 dollar short load fee under 3 cu yd.

Last checked: 19 November 2026.

Last updated: November 2026

Price assumptions (examples only): ready-mix $150 per cubic yard, $150 delivery, and a $90 short-load fee on orders under 3 cubic yards; 80 lb bags $6 each. Bags are usually cheaper below about 1 cubic yard (roughly 45 bags of 80 lb). Between 1 and 2 cubic yards it depends on local delivery and short-load fees, so get a quote. Above about 2 cubic yards ready-mix is almost always cheaper and easier.