Cement bags and sand for a sand and cement floor screed. Enter the room size and thickness, pick the mix and screed type, and get bag counts with BS 8204 minimum thickness checks.
Estimates only. Screed quantities use the dry volume factor of 1.33, cement at 1,440 kg per m3 and sand at 1,600 kg per m3. A screed is a floor topping, not structural concrete: it carries floor finishes, not building loads.
Floor screed calculator
A 5 by 4 m room with a 50 mm screed needs 17 bags of 25 kg cement and 1.17 m3 of sand at the standard 1:4 mix with 10% waste. The calculator above works out the same figures for any room: enter the length, width and thickness, choose bonded, unbonded or floating construction, and it returns cement bags, cement weight and sand volume and weight.
How to use
- Enter the room length and width, and the screed thickness you plan to lay.
- Choose the mix: 1:4 is the standard levelling screed mix, 1:3 is stronger for bonded floors, 1:4.5 is leaner for large areas.
- Choose the screed type: bonded sits on the slab, unbonded sits on a separating membrane, floating sits on insulation or underfloor heating.
- Pick your cement bag size and waste margin, then read off the bags and sand.
- Check the thickness warning: a bonded screed needs at least 25 mm, unbonded 50 mm and floating 65 mm to BS 8204-1.
Formula
Wet volume = Area x Thickness. Dry materials volume = wet volume x 1.33, because dry cement and sand settle into a smaller wet volume. Cement = dry volume / (1 + sand parts), sand = dry volume x sand parts / (1 + sand parts). A 1:4 mix has 5 parts in total, so cement is one fifth of the dry volume and sand is four fifths.
Practical tips
- Do not lay thinner than the minimum. A bonded screed under 25 mm risks debonding and cracking; if your levels only allow a thin layer, use a bonded system with a bonding agent, not a floating one.
- Allow drying time. A sand and cement screed dries at roughly 1 mm per day up to 50 mm, so a 50 mm screed needs about 50 days before tiles or wood go down. Forced heat causes curling.
- Level the slab below first. Dips in the slab eat screed fast: a 10 mm dip across a whole room adds a full extra layer of material.
- Protect floating screeds at edges. Insulation boards at the perimeter stop the screed bridging to the walls, which is what causes edge cracking.
Frequently asked questions
How much cement do I need for a screed?
For a 20 m2 room at 50 mm with a 1:4 mix, about 421 kg of cement, which is 17 bags of 25 kg, plus 1.17 m3 of sand. The calculator works it out from your exact room size.
What is the difference between screed and concrete?
Screed is a smooth sand and cement topping laid over a concrete slab to give a level floor finish. It has fine aggregate and lower strength than concrete, which has coarse aggregate and carries structural loads.
How thick should a floor screed be?
To BS 8204-1: bonded 25 mm minimum, unbonded 50 mm minimum, floating 65 mm minimum. Allow extra for uneven slabs so the thinnest spot still meets the minimum.
What mix ratio is best for floor screed?
1:4 cement to sand is the standard levelling screed mix. Use 1:3 where the screed is bonded and takes heavier wear, and 1:4.5 for large, lightly loaded areas.
More in the concrete calculator hub, including slabs, self levelling compound and mortar.