Bagged concrete is usually cheaper for small jobs under about 1 cubic yard, because ready-mix comes with delivery fees and short-load charges. Ready-mix wins on cost, speed, and labour above 1 to 2 cubic yards. Bags are usually cheaper below about 1 cubic yard (roughly 45 bags of 80 lb). Between 1 and 2 cubic yards it depends on local delivery and short-load fees, so get a quote. Above about 2 cubic yards ready-mix is almost always cheaper and easier.
How Each Option Works
Bagged concrete
You buy pre-mixed dry bags, add water, and mix on site with a wheelbarrow or a rented mixer. Common US sizes are 80 lb, 60 lb, and 40 lb bags.
Ready-mix concrete
A batch plant mixes the concrete and a truck delivers it ready to pour. You pay per cubic yard (US) or per cubic metre (UK). Delivery is fast, but trucks have minimum charges.
Mini-mix and volumetric trucks: the third option
Between bags and a full truck sits the mini-mix or volumetric truck. These mix on site and charge only for what you use, so there is no short-load fee. In the UK they are common for 0.5 to 1.5 m³ jobs, often around £140 to £220 per m³ all-in (example prices, October 2026). In the US, search for “short load” or “mini-mix” suppliers. For jobs around 1 to 2 cubic yards, this option can beat both bags and a standard truck.
Bag Yields You Need to Know
Verified yields for standard bagged concrete:
- 80 lb bag yields 0.60 ft³. You need 45 bags per cubic yard.
- 60 lb bag yields 0.45 ft³. You need 60 bags per cubic yard.
- 40 lb bag yields 0.30 ft³. You need 90 bags per cubic yard.
UK readers: a 25 kg bag yields about 0.0117 m³ (about 86 bags per m³). A 20 kg bag yields about 0.0094 m³ (about 107 bags per m³). Use our concrete bag calculator for exact bag counts.
Worked Example: 10×10 ft Slab at 4 in Thick
This is a classic DIY project. A 10×10 ft slab at 4 in thick needs 1.23 yd³. Add 10% waste and you need 1.36 yd³, which equals 62 × 80 lb bags. Check it yourself with our slab concrete calculator.
Bagged option (example prices):
- 62 × 80 lb bags at $6 each = $372, plus mixer hire at $60 for the day
- Your labour: roughly a full day of mixing and pouring
- Total example cost: about $432
Ready-mix, actual load (example prices):
- 1.36 yd³, rounded to 1.5 yd³, at $150 per yd³ = $225, plus $100 delivery
- Pouring time: under an hour
- Total example cost: about $325
Ready-mix with a 3-yard minimum (example prices):
- Many plants bill a 3 yd³ minimum: 3 × $150 = $450, plus $100 delivery
- Total: about $550
This third scenario is why you must ask about minimums. A 3-yard minimum makes ready-mix the most expensive option for this slab. All prices are EXAMPLES from October 2026. Check local suppliers for your actual costs.
Cost Comparison at Different Job Sizes
The table below uses example US prices ($6 per 80 lb bag, $150 per cubic yard of ready-mix, plus typical delivery fees). Bag counts include 10% waste. All prices are EXAMPLES.
| Job size | 80 lb bags needed (with 10% waste) | Bags cost (example) | Ready-mix cost (example, incl. delivery) |
|---|---|---|---|
| 0.5 yd³ | 25 | $150 | $175 (short-load fee) |
| 1 yd³ | 50 | $300 | $250 (delivery fee) |
| 2 yd³ | 99 | $594 | $400 (delivery fee) |
| 5 yd³ | 248 | $1,488 | $850 (delivery fee) |
The pattern is clear. Under about 1 cubic yard, bags win or break even because truck fees eat up the ready-mix advantage. Above 1 to 2 cubic yards, ready-mix pulls ahead fast.
For UK jobs, compare bag cost per m³ against ready-mix at an example £125 to £160 per m³ plus delivery. Use our concrete cost calculator to compare both options.
Break-Even Formula
To find your own tipping point, use this formula:
Break-even bag price = ready-mix delivered total ÷ bag count
Using the example: $325 ÷ 62 bags = $5.24 per bag. If you can buy 80 lb bags for less than $5.24, bags win on materials. Above that, ready-mix is cheaper before you even count your labour.
Time and Effort Comparison
Cost is only half the story. Mixing dozens of bags is hard physical work. Sixty-two 80 lb bags weigh about 4,960 lb, nearly two and a half tons, and every pound gets lifted, carried, and mixed.
| Factor | Bagged concrete | Ready-mix |
|---|---|---|
| Mixing time per yd³ | 3 to 4 hours (with mixer) | Zero (arrives mixed) |
| Labour needed | 1 to 2 people, heavy work | 2 to 3 people to place and finish |
| Weight handled (10×10 slab) | About 4,960 lb of bags | None (truck does the work) |
| Pouring speed | Slow, batch by batch | Continuous, one pour |
| Consistency | Varies between batches | Uniform from the plant |
| Scheduling | Work at your own pace | Must be ready when the truck arrives |
Mixing 45+ bags takes most of a day by hand. Ready-mix pours the same volume in under an hour. For a concrete calculator check on your volume, see how many batches your job really needs.
Strength and Grade: What Bags Can and Cannot Do
Bagged concrete suits non-structural work: fence posts, small pads, garden edging, and shed bases. Standard bagged mixes reach roughly 4,000 PSI, which is plenty for these jobs.
Structural work needs specified ready-mix. Driveways, foundations, and anything an inspector cares about should use a designed mix: in the US usually 3,500 to 4,000 PSI with the right air entrainment for frost; in the UK, designated mixes such as PAV1 or PAV2 to BS 8500, which bagged concrete cannot guarantee. If a project needs a specified strength, order ready-mix and get the grade in writing on the delivery ticket.
Hidden Costs to Watch
Bagged concrete
- Mixer hire (typically a daily rate)
- Extra bags for waste (always add 10%)
- Water supply on site
- Your time (a full day for larger jobs)
- Disposal of empty bags
Ready-mix
- Delivery fee (flat rate, often $100 or more)
- Short-load charge for orders under the truck minimum
- Standby time if your crew is not ready
- Pump hire if the truck cannot reach the pour site
- Washout area for the truck
Always ask the batch plant for the total delivered price, not just the per-yard rate.
Decision Matrix: Which Should You Choose?
| Job size | Best option | Why |
|---|---|---|
| Under 0.5 yd³ (fence posts, small repairs) | Bags | Truck fees make ready-mix uneconomical |
| 0.5 to 1 yd³ (small pad, steps) | Bags, usually | Close call; compare delivered quotes, or try mini-mix |
| 1 to 2 yd³ (10×10 slab, footings) | Ready-mix or mini-mix | Cheaper and much faster; mini-mix avoids the minimum charge |
| Over 2 yd³ (driveway, large slab) | Ready-mix | No contest on cost or labour |
Rule of thumb: more than about 45 bags, price a ready-mix delivery. Fewer than 25 bags, bags are almost always the answer.
FAQ
How many bags of concrete do I need per cubic yard?
A cubic yard needs 45 × 80 lb bags, 60 × 60 lb bags, or 90 × 40 lb bags. Add 10% for waste, so buy 50 × 80 lb bags in practice.
Is it cheaper to mix your own concrete or buy ready-mix?
Bagged concrete is cheaper for small jobs under about 1 cubic yard. Ready-mix is cheaper above 1 to 2 cubic yards, because the per-yard price is lower and you avoid hours of mixing labour. Compare total costs including delivery fees.
Does ready-mix have a minimum order?
Most plants do. Many bill a minimum of 1 to 3 cubic yards, and below that you pay a short-load fee or pay for the minimum anyway. Ask: “What is your minimum billed load, and what is the total delivered price for my volume?”
What is a short-load charge?
An extra fee when you order less than the truck’s minimum load, often under 3 to 4 cubic yards. The plant still sends a full truck, so you pay for the unused capacity. Get the total delivered price before ordering.
How long does it take to mix 45 bags of concrete?
With a hired mixer and two people, about 3 to 4 hours of continuous work. By hand in a wheelbarrow, allow a full day. Ready-mix delivers the same volume in under an hour.
Is bagged concrete as strong as ready-mix?
For everyday non-structural work, yes. Standard bagged mixes reach roughly 4,000 PSI. But bags cannot carry a certified strength grade, so driveways, foundations, and structural work need specified ready-mix ordered to the required grade.
Conclusion
For small repairs and posts, buy bags. For slabs, footings, and driveways above about 1 cubic yard, ready-mix usually costs less and saves a day of back-breaking work. In the middle ground, check a mini-mix or volumetric supplier first. Run your numbers with the calculators above and get a delivered quote from a local plant.
Related guides: See how many bags of concrete per cubic yard for exact counts. See our concrete cost per cubic yard for current prices.