How to Calculate Concrete for Footings

Concrete being poured into a dug footing trench with steel rebar reinforcement in place

To calculate concrete for footings, multiply length × width × depth: metres give cubic metres directly; feet divided by 27 give cubic yards. A 6 × 0.6 × 0.3 m strip footing needs 1.08 m³ (about 1.41 yd³). Add 10 to 15% waste for hand-dug trenches, or use our footing concrete calculator to skip the maths.

The Footing Formula

Footings are simple rectangular prisms, so the maths is straightforward.

Metric: measure length, width and depth in metres, then multiply: L × W × D = cubic metres.

Imperial: measure in feet (divide inches by 12), multiply, then divide by 27: (L × W × D) ÷ 27 = cubic yards.

For several footings, add each volume together. For round piers: 3.14 × radius² × depth in the same units.

Worked Examples: All Four Footing Types

Strip Footing (Imperial)

A typical strip footing for a garden wall or small extension: 20 ft long, 2 ft wide, 12 in deep.

  1. Convert depth: 12 in ÷ 12 = 1 ft.
  2. Multiply: 20 × 2 × 1 = 40 cubic feet.
  3. Convert: 40 ÷ 27 = 1.48 cubic yards.

Add 10 to 15% for trenches: 1.63 to 1.70 yd³. Order 1.70, or 77 × 80 lb bags (1.70 × 45).

Metric: 6 × 0.6 × 0.3 m = 1.08 m³; with 15% waste 1.24 m³, or 107 × 25 kg bags.

Pad Footing (Metric)

Pad footings suit deck posts and pergolas. One 0.6 × 0.6 × 0.3 m pad = 0.11 m³. Four pads = 0.43 m³, or 41 × 25 kg bags with 10% waste.

Imperial: a 2 ft × 2 ft × 12 in pad is 4 ÷ 27 = 0.15 yd³. Four pads = 0.59 yd³, or 30 × 80 lb bags with 10% waste.

Round Pier (Both Units)

Metric: 450 mm diameter, 750 mm deep (radius 0.225 m). Volume = 3.14 × 0.225² × 0.75 = 0.12 m³; with 10% waste 0.13 m³, or 12 × 25 kg bags.

Imperial: 18 in diameter, 30 in deep (radius 0.75 ft, depth 2.5 ft). Volume = 3.14 × 0.75² × 2.5 = 4.42 ft³ ÷ 27 = 0.16 yd³; with 10% waste 0.18 yd³, or 9 × 80 lb bags.

Stepped Footings on Slopes

On a slope, use stepped footings: level sections at different heights joined by vertical steps. Calculate each section separately and add them together, keeping each step no taller than the footing depth.

Post-Hole Deduction: Concrete Around an Existing Post

When a post sits in the hole, subtract the post volume from the hole volume.

Metric: 300 mm hole, 600 mm deep, 100 × 100 mm post. Hole: 3.14 × 0.15² × 0.6 = 0.042 m³. Post: 0.006 m³. Concrete = 0.036 m³ per hole, or 4 × 25 kg bags.

Imperial: 12 in hole, 24 in deep, 4 × 4 in post. Hole: 3.14 × 0.5² × 2 = 1.57 ft³. Post: 0.22 ft³. Concrete = 1.35 ft³ = 0.05 yd³ per hole, or 3 × 80 lb bags.

Ten holes need about 0.4 m³ (0.5 yd³), still bag territory. Twenty holes approach 1 m³ (1.3 yd³), where ready-mix starts to win.

Trench Footings vs Formed Footings

Trench footings are poured straight into the excavation: fast and cheap, but irregular walls need more waste. Formed footings use timber forms for exact dimensions and suit loose soil. Either way, the bottom must be firm, level, undisturbed soil. Never pour onto soft, loose or frozen ground.

Waste Factor by Site Condition

Site condition Waste allowance
Neat formed footings, clean subgrade 5 to 10%
Machine-dug trenches 10%
Rough hand-dug trenches, crumbly soil 12 to 15%
Post holes 10%

Running short mid-pour creates a cold joint, a permanent weak point. A little extra concrete is far cheaper than a second delivery.

7 Calculation Errors That Waste Money

  1. Forgetting to convert inches to feet before dividing by 27.
  2. Dividing cubic inches by the wrong number: it is 46,656 (36³), not 27.
  3. Double-counting corners: use centre-line lengths, not outside lengths.
  4. Ignoring over-dig on hand-dug trenches (see the waste table above).
  5. Skipping the waste factor entirely.
  6. Rounding down the order. Always round up.
  7. Using the dry bag volume instead of the mixed yield on the bag.

Footing Volume and Bag Count Reference

Common strip footing sizes with 15% waste (the hand-dug standard) and 80 lb bag counts (45 per cubic yard), rounded up.

Footing size (L × W × D) Volume With 15% waste 80 lb bags
20 ft × 2 ft × 12 in 1.48 yd³ 1.70 yd³ 77
30 ft × 2 ft × 12 in 2.22 yd³ 2.55 yd³ 115
20 ft × 2 ft × 18 in 2.22 yd³ 2.55 yd³ 115
30 ft × 3 ft × 12 in 3.33 yd³ 3.83 yd³ 173

Other bags: 60 lb = 60 per yard, 40 lb = 90 per yard. UK: 25 kg = 86 per m³, 20 kg = 107 per m³.

Bags vs Ready-Mix: The Crossover

Below about 1 m³ (1.3 yd³), bags with a mixer are usually practical. Above that, ready-mix saves hours of mixing and often costs less once you price your time. Example: a 1.2 m³ footing needs 104 × 25 kg bags (1.2 × 86) or one small ready-mix load. Small ready-mix loads carry minimum charges and delivery fees, so get both quotes. Compare costs with our concrete cost calculator.

Rebar in Footings

Most footings need steel: two or more continuous bars lengthwise. Bars per layer: floor(dimension ÷ spacing) + 1, kept 3 inches clear of soil. See our rebar calculator.

Footing Size Guidance by Wall Type

These are general starting points only. Check your local building code before you dig.

Wall type Typical width Typical depth Notes
Garden wall (up to 1 m high) 450 mm (18 in) 200 to 300 mm (8 to 12 in) Deeper in frost areas
Single-storey extension 600 mm (24 in) 750 mm to 1 m (30 to 39 in) Depth set by frost line
Two-storey extension 600 to 750 mm (24 to 30 in) 750 mm to 1 m (30 to 39 in) Engineer usually required
Deck or pergola posts (pads) 450 to 600 mm (18 to 24 in) square 300 to 450 mm (12 to 18 in) Below frost line

When Footings Need an Engineer

Do not size by rule of thumb when the footing is load-bearing, the soil is clay, peat or made ground, the site is steep or near trees or water, or codes require engineered drawings. This guide covers the concrete maths, not structural design.

Formula Cheat Sheet

  • Strip or pad, metric: L × W × D in metres = cubic metres
  • Strip or pad, imperial: (L × W × D in feet) ÷ 27 = cubic yards
  • Round pier: 3.14 × radius² × depth (metres → m³; feet ÷ 27 → yd³)
  • Cubic inches to yards: total ÷ 46,656
  • Waste: 5 to 10% formed, 10 to 15% hand-dug
  • Bags: 45 × 80 lb per yard; 86 × 25 kg per m³
  • Always round the order up

Example Cost Estimate

Prices are examples only and vary by region. Always get local quotes before budgeting.

At the example 2026 US price of $120 to $180 per cubic yard (before delivery), the 1.70 cubic yard footing costs roughly $204 to $306. In the UK, at £125 to £160 per cubic metre, 1.70 cubic yards (about 1.30 m³) costs roughly £163 to £208.

FAQs

How do you calculate concrete for footings?

Multiply length × width × depth: metres give cubic metres; feet divided by 27 give cubic yards. Example: 20 × 2 × 1 ft = 40 ft³ ÷ 27 = 1.48 yd³. Add 10 to 15% waste for trenches.

What is the formula for concrete footings?

Rectangle: (L × W × D) ÷ 27 = cubic yards in feet, or L × W × D = cubic metres in metres. Round pier: 3.14 × radius² × depth. Add waste and round up.

How many bags of concrete do I need for footings?

A 20 ft × 2 ft × 12 in footing needs 1.48 cubic yards, or 1.70 with 15% waste: 77 bags of 80 lb mix (45 per yard, rounded up). For 60 lb bags you need 102; for 40 lb bags, 153.

How deep should footings be for a deck?

Below the local frost line: roughly 12 inches in the southern US, 48 inches or more in the north, and 750 mm to 1 m in the UK. Deck post pads are usually 450 to 600 mm square and 300 to 450 mm deep.

Should I round concrete orders up or down?

Always round up. Running short mid-pour creates a cold joint, a permanent weak point. The extra concrete costs far less than a second delivery.

How much does it cost to pour concrete footings?

Example 2026 prices: $120 to $180/yd³ in the US (about $204 to $306 for 1.70 yd³); £125 to £160/m³ in the UK (about £163 to £208). Get local quotes.

Conclusion

Footing maths is simple: length × width × depth, plus waste. Size the footing to the structure and soil, check local codes, and use an engineer for load-bearing work.

Related guides: For slabs rather than footings, see our concrete slab thickness guide. For a slab example, see how much concrete a 10 by 10 slab needs.

About the author

Kaleemullah Formulas use standard geometry and published bag yields; sources are linked in each article.