Ready Mix Concrete Delivery Cost: Short Load Fees Explained (2026)

Ready mix concrete delivery truck discharging concrete through its chute at a residential building site

Ready Mix Concrete Delivery Cost

When you price ready-mix concrete, the batch plant quotes the price per cubic yard or per cubic metre first. It is almost never the number on your invoice. Delivery fees, short-load charges, standby time and pump hire can add 30 to 100 percent to a small order. This guide explains every charge, with worked US and UK examples.

Our companion article covers the material cost itself; this one is strictly about what the truck adds to your bill. Work out your volume with our concrete cost calculator before you call. Every price below is an EXAMPLE, not a quote.

The Short Answer

Delivery usually adds a flat fee of roughly $100 to $200 per US order, plus a short-load charge below the plant’s 1 to 3 cubic yard minimum. In the UK, volumetric mix-on-site trucks charge per cubic metre with no short-load fee, while batch plants add part-load surcharges. All figures here are examples.

What a Delivery Fee Actually Covers

A delivery fee is not the concrete. It covers sending a 20-tonne truck from the plant to your site and back: dispatch, the driver’s time, loading and washout. A standard drum truck carries up to about 10 cubic yards, so a small order uses the same truck and driver as a full one, which is why the fee is flat per load.

Example fees run from about $100 to $200 per US load. Always ask for the total delivered price rather than the headline per-yard rate.

US Short-Load Fees: The Three Common Structures

A short load is any order below the plant’s minimum. Most plants set the minimum at 1 to 3 cubic yards, and some at 4. Below that line, you pay for the unused truck capacity in one of three ways.

1. A flat short-load fee. A fixed surcharge, for example $100 to $250, on any order under the minimum.

2. A per-yard fee on the shortfall. With a 3-yard minimum and a $60 per-yard fee, a 2-yard order carries a $60 surcharge (1 yard short times $60).

3. A billed minimum load. Order 2 yards with a 3-yard minimum and you pay for 3. The most expensive structure, and more common than people expect.

Example: What Each Structure Costs on a 2-Yard Order

Example prices (October 2026): $150 per yard, $120 delivery fee, 3-yard plant minimum.

Fee structure Calculation Total delivered (example)
Flat $150 short-load fee (2 x $150) + $120 + $150 $570
$60 per yard on the shortfall (2 x $150) + $120 + (1 x $60) $480
Billed 3-yard minimum (3 x $150) + $120 $570

Same order, nearly $100 of difference. Ask every plant how it charges below its minimum.

Other Delivery Charges That Can Appear

  • Standby time. Plants allow a free discharge window, commonly about an hour. If your forms are not ready or your crew is short-handed, you pay standby rates for every extra minute.
  • Pump hire. If the truck cannot reach your pour site, you need a pump or a long chute run. Pump hire is a separate charge and often costs more than the delivery fee on small jobs.
  • After-hours and weekend delivery. Pouring outside normal plant hours usually carries a surcharge, and some plants charge an opening fee to run the batch plant specially.
  • Distance and fuel surcharges. Sites beyond the plant’s normal delivery radius attract extra mileage charges.

These rarely appear in the first quote. Ask for an itemised total before you book.

Worked Example: A 2 Cubic Yard Patio Slab

Your 12 x 10 ft patio slab needs 2 cubic yards. The plant quotes $150 per yard, charges $120 delivery, and applies a $60 per-yard short-load fee under its 3-yard minimum.

  • Material: 2 yards x $150 = $300
  • Shortfall below the minimum: 3 minus 2 = 1 yard
  • Short-load charge: 1 x $60 = $60
  • Delivery: $120
  • Total delivered: $480

Your effective price is $240 per yard, not $150. A rival quote of $165 per yard with no short-load fee and $100 delivery totals $430, beating the “cheaper” $150 quote. Compare totals, never headline rates.

UK: Volumetric Trucks and Minimum Loads

The UK market works differently, and small-order buyers often get the better deal.

Volumetric (mix-on-site) trucks carry raw materials in separate compartments and mix only what you need at the kerbside. There is no pre-loaded drum, so there is no short-load fee: you pay per cubic metre actually mixed. Example all-in prices run from about £140 to £220 per cubic metre for typical 0.5 to 2 m3 orders, which suits shed bases, small slabs and fence post runs.

Batch plants apply part-load surcharges below their minimum, usually 1 to 2 m3. Example surcharges run £40 to £80 on top of material at roughly £110 to £160 per m3. All examples.

Example UK Delivery Charges

Item Typical example range
Volumetric truck, 0.5 to 2 m3 £140 to £220 per m3, all in
Batch plant part-load surcharge £40 to £80 on top of material
Extra waiting time From about £30 per 15 minutes
Pump hire £250 to £400 per day

Check access before you book: a narrow lane can force a pump hire that wipes out the savings.

Five Ways to Cut Your Delivery Cost

  • Order up to the plant minimum. If you need 2.5 yards and the minimum is 3, the extra half yard is often cheaper than the short-load fee. Use it on a shed base, a path or thicker footings.
  • Price a volumetric or mini-mix supplier. In the US, search for “short load” or “mini-mix” suppliers; in the UK, volumetric trucks are the default for small jobs.
  • Be ready when the truck arrives. Forms set, crew in place, access clear. Standby time is the most avoidable charge on the list.
  • Get the total delivered price in writing, and book normal hours. Material, delivery, short-load fee, standby rate, pump: itemised before you book, with no after-hours surcharge.

FAQ

What is a short-load charge?

An extra fee a batch plant adds when your order falls below its minimum load, usually 1 to 3 cubic yards. The plant still sends a full-size truck, so you pay for the unused capacity. It can be a flat fee, a per-yard fee on the shortfall, or a billed minimum load.

How much does ready-mix delivery cost?

As examples, US delivery fees typically run $100 to $200 per load, with short-load surcharges of $60 to $250 on small orders. In the UK, volumetric trucks charge roughly £140 to £220 per m3 all in, while batch plants add part-load surcharges of about £40 to £80. Get local quotes.

Do I pay a delivery fee on every load?

Yes, on standard drum-mixer deliveries. Each truck that leaves the plant carries its own fee, so splitting an order across two small loads doubles it. Plan each pour to be as close to a full load as practical.

What is the minimum order for ready-mix concrete?

Most US plants set a minimum of 1 to 3 cubic yards, and many bill a 3-yard minimum. UK batch plants usually set 1 to 2 m3. Volumetric trucks mix only what you use, so they carry no equivalent minimum.

Are volumetric trucks cheaper than ready-mix?

For small UK orders, usually yes. A volumetric truck charges per cubic metre mixed with no short-load fee, while a batch plant adds a part-load surcharge. For full loads of 4 m3 or more, batch plant ready-mix is normally cheaper per cubic metre. Compare delivered totals for your exact volume.

Conclusion

Delivery charges are where small orders get expensive, and where a careful buyer saves the most. Learn the plant’s minimum and short-load structure, compare total delivered prices, and price volumetric or mini-mix options for anything under a few yards. For the material side, see our concrete cost per cubic yard guide and the concrete cost calculator.

Sources

About the author